How long is the delivery time of sintered filter material?
1. About the sintered wire mesh or sintered fiber felt
If it is the standad product, it will be about 5-7 days after receipt of payment.
If the quantity is too large, and there is not enough stock, or it is not the standard product, it will be 15-20 days according to quantity.
2. About the perforated sheet sintered with wire mesh or sintered powder:
It will be about 18-22 days, because it's a custom product.
Home
subscription
Pay attention to qr code
Get the latest information
- Liben Group Brand Name